Proyekto sa eskwelahan nga 100KW sa Zimbabwe

Project Information

save on electricity bills
4500+ USD / moon
local electricity price
0.26USD / Kwh
Payback Period
13 months
Start Your Project

Description

This project is located in a remote village in northern Zimbabwe and aims to address the issue of unstable power supply.  Due to the limited coverage of the power grid, the power outage incident seriously affected the daily teaching and living electricity usage of local teachers and students.  This project provides a stable power supply for the school by introducing a 100-kilowatt-hour solar system, ensuring the reliable operation of classroom lighting and the power system.  This system performs exceptionally well in both the rainy and dry seasons, significantly improving the quality of life for teachers and students.Half cell mono panels.

Mga Bentaha

23% Transfer Efficiency
25 Years warranty
Meet the power station acceptance standards
The high-efficiency parallel design ensures stable power output and ADAPTS to various load requirements.
Strong weather resistance: Specifically designed to withstand the hot, dry and wet seasons in Zimbabwe..
Equipped with an intelligent battery management system (BMS), it can monitor the safe and stable operation of the battery in real time.

Ipaambit isip:

Similar Completed Projects

Mag-subscribe sa Among Newsletter

    Disenyo ug Paghimo sa mga Sistema sa Enerhiya sa Solar sa Panimalay ug Komersyal

    Sunda Kami

    Gusto ba nimo og Libre nga Disenyo sa Solar System para sa imong bilding?

    Ibilin ang imong mobile number/whatsapp/email ug motubag mi sulod sa usa ka oras!

      Pagkuha og libreng konsultasyon, katalogo, detalye sa produkto, mga kinutlo ug uban pa karon.

      Pinulongan

      en_uszh_cncebarmga csdadeeleses_mxfafridkinijakonlptrutltrvi

      Pinulongan

      cebCebuano